Cove Area Mesa V Main Access Road Improvements

Navajo Nation, AZ

Bayside associates provided quality assurance, specification compliance and design support for the construction of road improvements over a 1.71 mile road alignment. Design requirements included the installation of riprap trenches to allow drainage to outfalls, check dams within drainage ditches, and an armored road drainage crossing.

Previous
Previous

Demolition of Overhead Conveyer and Furnace System