Interim Remedial Action Completion Report, IR Site 28 Vapor Intrusion

Former NAS Moffett Field
Moffett Field, CA
Naval Facilities Engineering Command

Bayside has been contracted by Naval Facilities Engineering Command (NAVFAC) Southwest and the NAVFAC Base Realignment and Closure (BRAC) Program Management Office (PMO) West to develop an Interim remedial action completion report (IRACR), as well as offering field engineering services for the U.S. Navy. The IRACR report follows from an ongoing project to remediate vapor intrusion (VI) of TCE, PCE, and various other harmful chemical compounds from the shallow groundwater table beneath the base. Bayside is the subcontractor for the U.S. Navy in creating the IRACR report for this listed superfund site, as well as offering various other Environmental engineering services. The report will entail the most recent and historical site-specific data for various environmental aspects. It will include operation and maintenance, as well as any established long-term monitoring plans of the site. The purpose of this project is to provide the Navy with a current and future action plan regarding the environmental remediation of this site to meet the EPA’s indoor are quality standards for TCE, PCE, and several other chemicals of concern discovered in the shallow groundwater table.

Previous
Previous

Installation Restoration Site 28 Vapor Intrusion monitoring, Operations, and Maintenance

Next
Next

Five-Year Reviews for Beale AFB and Travis AFB