Environmental Taryn Lohr Environmental Taryn Lohr

Verification of Study/Pilot Test for Colloidal Activated Carbon Treatment of Per- and Polyfluoroalkyl Substances (PFAS)  

NAVFAC BRAC PMO West awarded a task order to Bayside Engineering Construction, Inc. (Bayside) for colloidal activated carbon (CAC) treatment of per-and polyfluoroalkyl substances (PFAS) at Installation Restoration (IR) Site 14 at Alameda Point, Alameda, California (Site). Bayside collaborated with APTIM, Inc. on this project.

Read More
Environmental Liz Basinet Environmental Liz Basinet

Engineering Design Engineering and Evaluation/Cost Analysis (EE/CA), for Multiple Abandoned Mine Sites

Engineering Evaluation/Cost Analysis (EE/CA) to evaluate removal action alternatives and selecting a preferred remedy. Sub-tasks include: Cultural Resource Survey, Biological Baseline Study and Monitoring Plan (includes site reconnaissance and desktop review of biological resources), additional sampling to further delineate the depth of contamination in the tailings piles and sediments.

Read More
Environmental Liz Basinet Environmental Liz Basinet

Interim Remedial Action Completion Report, IR Site 28 Vapor Intrusion

The IRACR report follows from an ongoing project to remediate vapor intrusion (VI) of TCE, PCE, and various other harmful chemical compounds from the shallow groundwater table beneath the base. Bayside is the subcontractor for the U.S. Navy in creating the IRACR report for this listed superfund site, as well as offering various other Environmental engineering services.